CH1 Data Center - Chicago, IL

Specifications

Campus Overview
RagingWire Chocago CH1 Data Center - Itasca, IL
  •  Located in Itasca, approximately a 25-minute drive from O'Hare International Airport
  • 19-acre fully fenced campus
  •  Two planned data centers
  • Each data center has:
    • Two stories
    • 36MW of critical IT load
    • 6 vaults with 6MW in each vault
    • 230,000 sq.ft. of space
    • 126,000 sq.ft. of data hall space
    • Low-cost power with renewable energy options available
    • Diverse utility power feeds for superior redundancy
    • Industry-leading compliance and safety procedures
    • Anti-climb perimeter fence and multi-factor authentication
Specifications
RagingWire Chocago CH1 Data Center - Itasca, IL
  • 230,000 sq. ft. of total space
  • 126,000 sq. ft. of data floor space
  • 6 vaults with 6MW in each vault
  • Designed to meet NIST 800-53, FISMA, HIPAA, ISO 27001, PCI DSS, SOC Type 1 and Type 2 compliance standards 
  •  Amenities including Class A office space, dedicated parking, customer lounge, conference rooms, ergonomic workstations, free coffee, beverages and soda, and free Wi-Fi
Power and Cooling
RagingWire Chocago CH1 Data Center - Power and Cooling
  • Four primary 34.5kV utility feeds, plus one alternate feed
  • Eight 1MW UPS modules for every 6MW capacity
  •  Lithium lon battery with 5 minutes run time at full load
  • On-site fuel storage to support 24 hours run time at full load with 24x7x365 fuel delivery
  • Diverse power distribution to data hall (A and B feeds) for superior redundancy
  • Renewable energy options available 
  • Dedicated infrastructure options
  • 100% uptime SLA
  • N+1 redundancy at the rack level with 4 to make 3 design
  • Fan wall design 
  • Air-cooled chillers with airside economizers
  • Dedicated modular chiller plant for every 6MW vault
Network
RagingWire Chocago CH1 Data Center - Network
  • Carrier-neutral data center with 3 diverse fiber entrances
  • Designed to meet TIA-942 standards (noticed standards is capitalized on brochure. May want to change that to lowercase) 
  • Multiple "Meet Me" rooms
  • Fiber-connected and fully integrated with other NTT data centers.
  • Access to many global and regional carriers and ISPs offering dark fiber, wavelength, ethernet, MPLS, VPLS, IP transit, and peering
  • Ability to access multiple leading public, private, and hybrid cloud providers
Security
RagingWire Chocago CH1 Data Center - Security
  • Fenced campus with strict access control procedures
  • 24x7x365 security and facility operations team
  • Multifactor authentication layered throughout the facility, using multiple challenge points
  • Secure managed shipping and receiving area available 24x7x365
  • Designed to meet NIST 800-53, FISMA, HIPAA, ISO 27001, PCI DSS, SOC Type 1 and Type 2 compliance standards

Data Center Specifications

RagingWire Chocago CH1 Data Center - Itasca, IL
  •  Located in Itasca, approximately a 25-minute drive from O'Hare International Airport
  • 19-acre fully fenced campus
  •  Two planned data centers
  • Each data center has:
    • Two stories
    • 36MW of critical IT load
    • 6 vaults with 6MW in each vault
    • 230,000 sq.ft. of space
    • 126,000 sq.ft. of data hall space
    • Low-cost power with renewable energy options available
    • Diverse utility power feeds for superior redundancy
    • Industry-leading compliance and safety procedures
    • Anti-climb perimeter fence and multi-factor authentication
RagingWire Chocago CH1 Data Center - Itasca, IL
  • 230,000 sq. ft. of total space
  • 126,000 sq. ft. of data floor space
  • 6 vaults with 6MW in each vault
  • Designed to meet NIST 800-53, FISMA, HIPAA, ISO 27001, PCI DSS, SOC Type 1 and Type 2 compliance standards 
  •  Amenities including Class A office space, dedicated parking, customer lounge, conference rooms, ergonomic workstations, free coffee, beverages and soda, and free Wi-Fi
RagingWire Chocago CH1 Data Center - Power and Cooling
  • Four primary 34.5kV utility feeds, plus one alternate feed
  • Eight 1MW UPS modules for every 6MW capacity
  •  Lithium lon battery with 5 minutes run time at full load
  • On-site fuel storage to support 24 hours run time at full load with 24x7x365 fuel delivery
  • Diverse power distribution to data hall (A and B feeds) for superior redundancy
  • Renewable energy options available 
  • Dedicated infrastructure options
  • 100% uptime SLA
  • N+1 redundancy at the rack level with 4 to make 3 design
  • Fan wall design 
  • Air-cooled chillers with airside economizers
  • Dedicated modular chiller plant for every 6MW vault
RagingWire Chocago CH1 Data Center - Network
  • Carrier-neutral data center with 3 diverse fiber entrances
  • Designed to meet TIA-942 standards (noticed standards is capitalized on brochure. May want to change that to lowercase) 
  • Multiple "Meet Me" rooms
  • Fiber-connected and fully integrated with other NTT data centers.
  • Access to many global and regional carriers and ISPs offering dark fiber, wavelength, ethernet, MPLS, VPLS, IP transit, and peering
  • Ability to access multiple leading public, private, and hybrid cloud providers
RagingWire Chocago CH1 Data Center - Security
  • Fenced campus with strict access control procedures
  • 24x7x365 security and facility operations team
  • Multifactor authentication layered throughout the facility, using multiple challenge points
  • Secure managed shipping and receiving area available 24x7x365
  • Designed to meet NIST 800-53, FISMA, HIPAA, ISO 27001, PCI DSS, SOC Type 1 and Type 2 compliance standards
Please fill out the form below and one of our data center solutions experts will contact you.
This information is for internal use only and will not be distributed to any other parties.

* denotes a required field