Stay up to date on the latest news and milestones from our new Phoenix data center campus currently under construction.
July 2021
An aerial view shows our Phoenix data center campus. At the center Phoenix PH1 - the first of seven data centers.
June 2021
The team begins to carve out the pads for the equipment yard on the North side of the building.
An aerial view shows the progress of the installation of PH1’s roof.
The install of the roof continues.
May 2021
The construction team has begun adding the roof and structural steel framing to the building.
All sides of the building are almost completely installed before adding the roof to the building.
The construction team is seen adding the tilt up walls to the building using a crane.
The tilt up walls have begun installation.
Concrete has been poured on the base of PH1. The rooms and vaults have been sectioned off. The tilt up walls are being cast in place before installation.
An aerial view over the PH1’s construction zone, shows a footprint of the data center. The yellow portion shows where the steel re-bar has been installed, awaiting a concrete pour.
The substation has been installed at the Phoenix campus.
We have officially broken ground on phase one of our Phoenix data center campus, Phoenix PH1.
April 2021
Announcing NTT’s newest data center campus located in Mesa, Arizona. NTT’s Phoenix data center campus will have seven data centers on its 102 acre campus. The first phase of the campus, Phoenix PH1 will include a 2 story building with a reinforced slab floor design. PH1 will have 36MW of critical IT load distributed between 6 vaults. To learn more about our campus, please visit our Phoenix At-A-Glance datasheet.